Timeline Planner
Estimate your construction schedule phase-by-phase based on house size, floors, and finish level.
Estimated Duration
~12 months
Planned Start
May 2026
Estimated Completion
May 2027
Construction Phases
Demolition, clearing, levelling, and setting out.
Excavation, footings, raft/strip foundation pouring and curing.
Plinth beam construction and damp-proof course application.
Brick masonry, RCC columns, beams, and slab per floor.
Final slab pour, curing, and waterproofing membrane application.
Concealed plumbing and electrical conduit work within walls.
Internal and external plastering. Two coats for external surfaces.
Tile or stone flooring installation throughout.
Door frames, doors, windows, and built-in cabinetry.
Switches, sockets, fixtures, taps, and sanitary ware installation.
Interior emulsion and exterior weather-resistant paint.
Snagging, touch-ups, site cleanup, and handover preparation.
Darker bar = estimated midpoint duration. Lighter bar = maximum estimate. Monsoon season (June–September) typically slows outdoor work by 20–30%. Add 4–8 weeks of buffer for weather, material delays, and approvals.